{"id":3715,"date":"2018-10-27T17:52:43","date_gmt":"2018-10-27T17:52:43","guid":{"rendered":"http:\/\/www.styledeals.co.uk\/blog\/production-line-at-ford-in-bridgend-to-shut-for-five-days\/"},"modified":"2018-10-27T17:52:43","modified_gmt":"2018-10-27T17:52:43","slug":"production-line-at-ford-in-bridgend-to-shut-for-five-days","status":"publish","type":"post","link":"https:\/\/www.styledeals.co.uk\/blog\/production-line-at-ford-in-bridgend-to-shut-for-five-days\/","title":{"rendered":"Production line at Ford in Bridgend to shut for five days"},"content":{"rendered":"\n<div property=\"articleBody\">\n<figure class=\"media-landscape has-caption full-width lead\"><span class=\"image-and-copyright-container\"><\/p>\n<p>                <img loading=\"lazy\" decoding=\"async\" class=\"js-image-replace\" alt=\"Ford Bridgend\" src=\"https:\/\/ichef.bbci.co.uk\/news\/320\/cpsprodpb\/17B2A\/production\/_100366079_ford.bridgend.pa.jpg\" width=\"976\" height=\"549\"\/><span class=\"off-screen\">Image copyright<\/span><br \/>\n                 <span class=\"story-image-copyright\">PA<\/span><\/p>\n<p>            <\/span><figcaption class=\"media-caption\"><span class=\"off-screen\">Image caption<\/span><br \/>\n                <span class=\"media-caption__text\"><br \/>\n                    Staff have been told the AJ production line will be closed for five days from 29 October<br \/>\n                <\/span><br \/>\n            <\/figcaption><\/figure>\n<p class=\"story-body__introduction\">Staff at Ford&#8217;s plant in Bridgend working on the new Jaguar engine have been told not to come into work for five days.<\/p>\n<p>The AJ production line at the plant will shutdown from 29 October to 2 November, the car maker confirmed.<\/p>\n<p>Letters were sent to staff this week &#8211; a move which union officials said came as a surprise.<\/p>\n<p>Wales&#8217; first minister Carwyn Jones said he wanted assurances the move was only temporary.<\/p>\n<div class=\"social-embed\">\n<div class=\"social-embed-post social-embed-twitter\">\n<div class=\"embed embed-twitter\">\n<div class=\"embed-region\" role=\"region\" aria-label=\"Twitter post by @AMCarwyn\">\n            <a class=\"off-screen jump-link\" href=\"#jump-linkhttps:\/\/twitter.com\/AMCarwyn\/status\/1056137885097910272\">Skip Twitter post  by @AMCarwyn<\/a><\/p>\n<div class=\"twitter-wrap\">\n<blockquote class=\"twitter-tweet\" data-lang=\"en\">\n<p lang=\"en\" dir=\"ltr\">I will be looking for a meeting this week to confirm that this is only temporary. In these difficult  times Bridgend workers need certainty despite Brexit.<br \/>Another reason why there needs to be a good deal for our car industry. <a href=\"https:\/\/t.co\/hESpyMiV8M\">https:\/\/t.co\/hESpyMiV8M<\/a><\/p>\n<p>\u2014 Carwyn Jones AM\/AC (@AMCarwyn) <a href=\"https:\/\/twitter.com\/AMCarwyn\/status\/1056137885097910272?ref_src=twsrc%5Etfw\">October 27, 2018<\/a><\/p><\/blockquote><\/div>\n<p class=\"off-screen\" id=\"jump-linkhttps:\/\/twitter.com\/AMCarwyn\/status\/1056137885097910272\" tabindex=\"-1\">End of Twitter post  by @AMCarwyn<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<p>News of the shutdown has caused fresh anxiety for those at the plant &#8211; which is one of the biggest employers in Wales.<\/p>\n<p>Last week, Ford&#8217;s European boss Steven Armstrong warned <a href=\"https:\/\/www.bbc.co.uk\/news\/business-45860777\" class=\"story-body__link\">a no-deal Brexit could affect the company&#8217;s future in the UK<\/a>.<\/p>\n<p>And in 2017, it was announced <a href=\"https:\/\/www.bbc.co.uk\/news\/uk-wales-41427172\" class=\"story-body__link\">production of engines for Jaguar Land Rover would end three months earlier than expected<\/a>.<\/p>\n<p>A spokeswoman for Ford said: &#8220;We have initiated five days downtime on one of our production lines at Bridgend Engine Plant from 29 October.<\/p>\n<p>&#8220;The production line builds engines for a third-party.&#8221;<\/p>\n<p>It is understood the workers affected will still get basic pay.<\/p>\n<figure class=\"media-with-caption\">\n<div class=\"player-with-placeholder\">\n            <img decoding=\"async\" class=\"media-placeholder player-with-placeholder__image narrative-video-placeholder\" src=\"https:\/\/ichef.bbci.co.uk\/images\/ic\/720x405\/p06nyc61.jpg\"\/><\/p>\n<p>Media playback is unsupported on your device<\/p>\n<\/p><\/div><figcaption class=\"media-with-caption__caption\"><span class=\"off-screen\">Media caption<\/span>Ford&#8217;s Steven Armstrong: No-deal Brexit would be costly<\/figcaption><\/figure>\n<hr class=\"story-body__line\"\/>\n<p><strong>Analysis: Sarah Dickins, BBC Wales economics correspondent<\/strong><\/p>\n<p>The timing of the shutdown is somewhat ironic &#8211; it comes as the plant celebrates a year since the first production of its new Dragon engine for Ford cars. <\/p>\n<p>Investment in that new engine for Ford was welcomed, but there has been concern about the long-term viability of the plant for some time.<\/p>\n<p>This latest move comes at a time when the automotive components sector starts to feel the impact of cuts in production by big car makers.<\/p>\n<p>Jaguar Land Rover (JLR), owned by Tata Group,  announced cuts in production at its plants in Solihull , Halewood and Castle Bromwich. As a result there is less demand for the parts that go into the cars.  <\/p>\n<p>The company has blamed falling demand in China and also &#8220;Dieselgate&#8221; &#8211; the UK government&#8217;s change of policy on diesel cars and the subsequent fall in sales of diesel vehicles.<\/p>\n<p>At the same time, car makers are becoming increasingly vocal about their fears about the possible effect of Brexit on the industry. <\/p>\n<p>BMW said in September that it would stop producing its minis at Cowley in Oxford for a month when the UK leaves the EU .<\/p>\n<\/p><\/div>\n<p><script async src=\"http:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><br \/>\n<br \/>\n<br \/><a href=\"https:\/\/www.bbc.co.uk\/news\/uk-wales-46002556\">Source<\/a> by <a href=\"\">[author_name]<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Image copyright PA Image caption Staff have been told the AJ production line will be closed for five days from 29 October Staff at Ford&#8217;s plant in Bridgend working on the new Jaguar engine have been told not to come into work for five days. The AJ production line at the plant will shutdown from &hellip; <\/p>\n","protected":false},"author":0,"featured_media":3716,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3715","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general"],"_links":{"self":[{"href":"https:\/\/www.styledeals.co.uk\/blog\/wp-json\/wp\/v2\/posts\/3715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.styledeals.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.styledeals.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.styledeals.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=3715"}],"version-history":[{"count":0,"href":"https:\/\/www.styledeals.co.uk\/blog\/wp-json\/wp\/v2\/posts\/3715\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.styledeals.co.uk\/blog\/wp-json\/wp\/v2\/media\/3716"}],"wp:attachment":[{"href":"https:\/\/www.styledeals.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=3715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.styledeals.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=3715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.styledeals.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=3715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}